Figure Captions | Table of Contents

Table 2. Extended coring summary.

Site/hole Number of APC cores Number of XCB cores Number of RCB cores Number of DCB cores Number of MDCB cores Seafloor (mbrf) Rig floor elevation (m) Total penetration (mbrf) Comment
                   
1179A 1 0 0 0 0 5576.5 11.0 5586.5  
1179B 6 0 0 0 0 5574.4 11.0 5629.5  
1179C 24 3 0 0 0 5576.7 12.8 5869.6  
1179D 0 0 22 0 0 5577.0 11.0 6052.0  
1179E 0 0 0 0 0 5577.0 11.1 5976.0 Hole dedicated to seismometer package installation
Totals: 31 3 22 0 1 5576.3 11.4 5822.7  
                   
1180A 0 0 0 0 0 2157.0 11.5 2162.0 HRRS spud tests
1180B 0 0 0 0 0 2157.0 11.5 2165.0 HRRS spud tests
1180C 0 0 0 0 0 2132.0 11.5 2135.0 HRRS spud tests
Totals: 0 0 0 0 0 2148.7 11.5 2154.0 HRRS spud tests
                   
1181A 0 0 0 0 0 995.0 11.0 998.0 HRRS spud tests
1181B 0 0 0 0 0 981.0 11.6 984.0 HRRS spud tests
1181C 0 0 0 0 0 970.0 11.6 973.0 HRRS spud tests
Totals: 0 0 0 0 0 982.0 11.4 985.0 HRRS spud tests
                   
1182A 0 0 0 0 0 2878.0 11.7 2880.0 HRRS spud tests
1182B 0 0 0 0 0 2878.0 11.7 2879.5 HRRS spud tests
1182C 0 0 0 0 0 2877.0 11.7 2882.0 HRRS spud tests
1182D 0 0 0 0 0 2870.0 11.7 2873.0 HRRS spud tests
1182E 0 0 0 0 0 2872.0 11.7 2876.5 HRRS spud tests
1182F 0 0 0 0 0 2873.0 11.7 2876.8 HRRS spud tests
1182G 0 0 0 0 0 2873.0 11.7 2878.0 HRRS spud tests
Totals: 0 0 0 0 0 2874.4 11.7 2878.0 HRRS spud tests
                   

Figure Captions | Table of Contents