Table 1. Chronologic operations summary.
Date | Location | Task | ||
Start | Finish | |||
(2000) | (2000) | |||
7 Nov | 14 Nov | Port call | ||
14 Nov | 18 Nov | Transit | ||
18 Nov | 22 Nov | Hole 1188A | RCB coring | |
22 Nov | 23 Nov | Hole 1189A | RCB coring | |
23 Nov | 25 Nov | Holes 1190A, 1190B, 1190C | RCB coring | |
25 Nov | 27 Nov | Hole 1188B | RAB/LWD/ADCB | |
27 Nov | 28 Nov | Site 1191 | RCB coring | |
28 Nov | 1 Dec | Holes 1188C, 1188D, 1188E | No coring | |
1 Dec | 12 Dec | Hole 1188F | Casing | |
12 Dec | 21 Dec | Hole 1188F | ADCB coring/logging | |
21 Dec | 22 Dec | Hole 1188F | Water-sampling/temperature measurements | |
22 Dec | 26 Dec | Hole 1189B | HRRS casing/RCB coring/logging | |
27 Dec | 29 Dec | Hole 1189C, Hole 1188F | RAB/LWD/ logging, temperature measurements/water sampling |
Note:
RCB = rotary core barrel, RAB = resistivity at bit, LWD = logging while drilling
ADCB = advanced diamond core barrel, HRRS = hard-rock reentry system.