Next Table | Table of Contents

Table T2. Summary of PCS operations, Leg 201.

Run
Core
Date (2002)
Depth (mbsf)
Recovered (m)
Pressure (psi)
Gas volume
Comments

201-






1
1225A-29P
10-Feb
262.2
0.41
1200
70 mL

2
1225C-32P
13-Feb
293.8
1.00
4800
70 mL

3
1226B-42P
22-Feb
378.0
0.66
6200
60 mL

4
1226E-21P
25-Feb
378.0
1.02
0
Chert prevented ball valve from closing
5
1227A-15P
1-Mar
129.1
0.00
0
Actuation mechanism failed
6
1228A-23P
5-Mar
198.9
0.07
35
60 mL
Cutting shoe lost in hole
7
1229D-10P
9-Mar
77.8
0.86
400
2.88 L

8
1230A-7P
12-Mar
52.3
1.00
6278
1.16 L

9
1230A-16P
13-Mar
127.3
1.00
7794
3.11 L

10
1230A-20P
13-Mar
156.8
0.65
5930
6.33 L

11
1230A-25P
14-Mar
196.8
0.18
8050
0.200 L

12
1230A-36P
15-Mar
254.6
0.41
8086
1.16 L

13
1230A-39P
15-Mar
276.8
0.62
280
1.53 L

14
1230B-4P
17-Mar
22.0
1.00
7400
0.775 L

15
1230B-10P
17-Mar
71.5
1.00
7416
1.14 L

16
1230B-14P
18-Mar
103.0
1.00
8030
1.765 L

17
1230E-5P
18-Mar
34.0
1.00
6134
0.26 L

Next Table | Table of Contents