Figure 2. Schematic cross-section showing the Bahamas Transect. The two proximal sites, Unda and Clino, were drilled during the Bahamas Drilling Project. BT-1 through BT-4 are planned to be drilled during Leg 166.
To Figure 3
166 Table of Contents
Publications Home
ODP Home