168 Prospectus
TABLE 2. SITE OPERATIONS SUMMARY (Priority 2)
Site (Lat/Long) Line/Shot Water Penetration Operations Time
Location Depth Sediment (m)/ (days)
(m) Basement (m)
PP-2A 47°46.71' 95-27/370 2682 265/1 APC/XCB 2.3
127°44.47'
PP-5A 47°45.76' 95-26/340 2679 0/100+ Deepen into 2.8
127°45.55' Basement
PP-6A 47° 42.61' 95-23b/70 2618 0/100 RCB 3.0
127°47.18'
PP-7A 47°42.63' 95-23b/60 2687 40, 95, APC/XCB 2.2
-8A/9A 127°47.37' & 135
PP-10A 47°44.68' 95-32/285 2683 275/1 APC/XCB 2.4
127°45.97'
LH-2A 47° 46.23' 95-23a/615 2662 280/1 APC/XCB 2.3
128° 04.62'
Note: These holes are listed with no internal priority implied; the order of drilling
will depend on earlier results of the leg. Basement penetration listed for APC/XCB
drilling (1 m) indicates minor recovery.
To Figure 1
168 Table of Contents
Publications Home
ODP Home