169 Prospectus
TABLE 2: PROJECTED LOGGING PLAN
Site/Hole Measurements Time (days)
Hole 858G Temperature, fluid sampler 0.5
Hole 857D Temperature, fluid sampler, 2.0
full Schlumberger logging suite,
(± packer and flowmeter)*
BH1 Full Schlumberger logging suite, 2.0
geochemical (± temperature)**
ET7 Full Schlumberger logging suite, 2.0
(± temperature)**
ET5 Full Schlumberger logging suite, 2.0
geochemical (± temperature)**
* Depending on hole conditions and time constraints.
** May be required at the beginning of the logging program by excessively
high temperatures.