Water | Transit | Coring | |||||||
Site | Lat (N) | Depth | Penetration | 10.5 kt | Time | Log | Total | ||
Name | Lon (W) | (m) | (mbsf) | Location | Operations | (days) | (days) | (days) | (days) |
Transit: | Saanich Inlet | to | Victoria: | dep 0600 20 Aug | - arr 1200 20 Aug | 0.3 | 0.3 | ||
Port Call | for Scientific | Party: | Sci arr 19 Aug | dep 1200 21 Aug | 1.0 | 1.0 | |||
Hole 858G | 48°27.36' 128°42.53' | 2415 | 0 | beside Dead Dog Hydrothermal Mound | Remove-CORK, T log, sample, replace-CORK | 0.9 | 3.8 | 4.7 | |
BH-1 | 48°26.02' 128°40.85' | 2435 | 200 sed 50 bsmt | Bent Hill Hydrothermal Mound | RCB 50 m Pilot Hole DIC 50 m, RCB 250 m, Log | 0.1 | 0.6 3.1 | 2.0 | 0.7 5.1 |
Hole 857D | 48°26.5' 128°42.65' | 2420 | 200 bsmt | 1 nmi south of Dead Dog Mound and 858G | Remove CORK, T log, sample, drill 1 bit, packer, reisntall CORK w/instr. | 0.1 | 6.1 | 2.0 | 8.2 |
DD-1 | 48°27.35' 128°42.60' | 2410 | 50 sed | Dead Dog Hydrothermal Mound | APC, XCB 50 m | 0.1 | 0.9 | 1.0 | |
DD-2 | 48°27.35' 128°42.60' | 2425 | 50 sed | Dead Dog Hydrothermal Mound | APC, XCB 50 m, WSRP | 0.1 | 0.9 | 1.0 | |
DD-3 | 48°27.35' 128°42.55' | 2425 | 50 sed | Dead Dog Hydrothermal Mound | APC, XCB 50 m, WSRP | 0.1 | 0.9 | 1.0 | |
BH-3 to 6 | 48°26.02' 128°40.93' | 2450 | 200 sed | Bent Hill Hydrothermal Mound | APC, XCB 200 m APC, XCB 200 m APC, XCB 200 m | 0.1 | 1.7 1.4 1.6 | 1.8 1.4 1.6 | |
Transit: | dep 20 Sep | 1.8 | |||||||
ET-7 | 40°57.50' 127°30.50' | 3340 | 600 sed 50 bsmt | Escanaba Trough | APC, XCB 600 m, Log | 6.1 | 1.7 | 7.8 | |
ET-1 to 4 | 41°00' 127°29.00' | 3240 | 200 sed 50 bsmt | Escanaba Trough | APC, XCB 250 m APC, XCB 250 m | 0.2 | 2.7 2.6 | 2.9 2.6 | |
ET-5 | 41°00' 127°29.00' | 3250 | 200 sed 200 bsmt | Escanaba Trough | APC, XCB 220 m, FFF, RCB 600 m, Log | 0.1 | 7.9 | 2.0 | 0.1 9.9 |
Transit | to San Diego: | dep 0800 14 Oct | -- arr 0600 17 Oct | 2.9 | 2.9 | ||||
Est Time= | 8.1 | 41.7 | 7.7 | 57.5 | |||||
Available Time= | 6.0 | 52.0 | 58.0 |