Site | Latitude Longitude | Water Depth (m) | Penetration (days) | Drilling Operations (days) | Logging *Tools | Logging (days) | Transit Time (days) |
Primary | |||||||
Transit San Diego to CR-1 | 8.3 | ||||||
CR-1 | 9°38.4'N 86°12'W | 4350 | 550 | 6.3 | LWD, C1, C2, T | 3.2 | |
Transit from CR-1 to CR-2 | 0.1 | ||||||
CR-2 | 9°39.7'N 86°12'W | 4160 | 750 | 9.4 | LWD, C1**, C2**, T | 3.0 | |
Transit from CR-2 to CR-3 | 1.6 | ||||||
CR-3 | 9°43.8'N 86°7.2'W | 3320 | 1400 | 17.9 | LWD, C1**, C2**, T | 6.1 | |
Transit to Panama | 1.6 | ||||||
Total | 33.6 | 12.3 | 10.1 | ||||
Total Days at Sea = 56.0 | (Available Time = 56.0) | ||||||
Alternate | |||||||
CR-4 | 9°46.8'N 86°2.4'W | 2200 | 1000 | 9.0 | C1**, T | 1.3 | |
CR-5 | 9°42.0'N 86°8.4'W | 3580 | 1150 | 13.6 | LWD**, T** | 6.3 | |
Total | 22.6 | 7.6 | 0.0 | ||||
Total Days at Sea = 79.1 | (Available Time = 56.0) |