Site: APRIS-06A

Priority: 2 (alternate to APRIS-02A)
Position:
64°13.72'S, 70°50.45'W
Water Depth:
3500 m
Sediment Thickness:
>2000 m
Approved Maximum Penetration:
800 mbsf
Seismic Coverage:
Line IT92-114 SP 550


Objectives:
The objectives of Site APRIS-06A are to:

1. Sample the deeper part of the stratigraphic section not drilled at Site APRIS-03A.

2. Obtain a high-resolution history of Antarctic Peninsula glaciation for the last 6-10 m.y.

3. Determine the onset of drift formation by sampling the base of Unit M4.


Drilling Program:
Double APC until refusal (about 200 m) then XCB. The site is offset by ~90 km from main site, Site APRIS-01A. Offset required if stratigraphic control seriously degraded below silica diagenetic BSR at ~590 m at main site.


Logging and Downhole Operations:
Standard suites IPLT-DLT and FMS-sonic, plus GHMT.


Nature of Rock Anticipated:
Alternating (interglacial) biosiliceous clay and (glacial) laminated barren gray clay, becoming claystone downhole.


To 178 Site APSHE-06

To 178 Table of Contents

ODP Publications

ODP Home