Site:
SWPAC-1C
Track Line SWPAC-1C
Seismic Line
SWPAC-1C
Priority: 1
Position: 44°45.33'S, 172°23.6'E
Water Depth: 315 m
Sediment Thickness: >2000 m
Target Drilling Depth: 500 m
Approved Maximum Penetration: 600 m
Seismic Coverage: BP Line CB-82-22, CB82-43/7, Ewing Lines
1b, 2e
Objectives: The objectives of SWPAC-1C are to:
Drilling Program: Double APC, XCB
Logging and Downhole Operations: Triple combo, FMS/Sonic, GHMT
Nature of Rock Anticipated: Terrigenous silts, muds, and minor sands