Table 2. Alternate Sites
Site No. |
Location Lat/Long |
Water Depth |
Operations Description |
PPSP Depth |
Priority Alt. For |
Drilling (days) |
Logging (days) |
Total On-site |
KIP-1D |
50°11.1'S |
1460m |
RCB coring 480m sediment + 160m basement = 640 mbsf TD |
880mbsf |
1 |
5.3 |
1.1 |
6.4 |
63°56.2'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
n/a |
||||||
KIP-13A |
59°44.9'S |
1646m |
RCB coring 540m sediment + 160m basement = 700 mbsf TD |
940mbsf |
2 |
6.2 |
1.2 |
7.4 |
84°19.9'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
13B |
||||||
KIP-6D |
56°50.0'S |
1162m |
RCB coring 450m sediment + 160m basement = 610 mbsf TD |
850mbsf |
2 |
5.0 |
1.1 |
6.1 |
68°26.8'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
6C |
||||||
KIP-7C |
53°41.6'S |
1109m |
RCB coring 700m sediment + 160m basement = 860 mbsf TD |
1100mbsf |
2 |
6.3 |
1.2 |
7.5 |
75°38.0'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
7B |
||||||
KIP-3C |
50°57.3'S |
840m |
RCB coring 460m sediment + 160m basement = 620 mbsf TD |
860 mbsf |
2 |
4.6 |
0.7 |
5.3 |
70°37.2'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
3F |
||||||
KIP-2C |
46°17.0'S |
2450m |
RCB coring 370m sediment + 160m basement = 530 mbsf TD |
770mbsf |
2 |
5.7 |
0.9 |
6.6 |
68°30.0'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
2E |
||||||
KIP-9C |
32°08.8'S |
1215m |
RCB coring 160m sediment + 160m basement = 320 mbsf TD |
560mbsf |
2 |
3.9 |
0.9 |
4.8 |
97°09.9'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
9B |
||||||
KIP-1A |
50°08'S |
1050m |
RCB coring 400m sediment + 160m basement = 560 mbsf TD |
800mbsf |
3 |
4.6 |
0.7 |
5.3 |
64°40.0'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
n/a |
||||||
KIP-1B |
50°18'S |
2000m |
RCB coring 360m sediment + 160m basement = 520 mbsf TD |
760mbsf |
3 |
5.5 |
0.8 |
6.3 |
64°05.0'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
1A |
||||||
KIP-1E |
50°13.0'S |
1550m |
RCB coring 420m sediment + 160m basement = 580 mbsf TD |
820mbsf |
3 |
5.3 |
1.1 |
6.4 |
63°54.5'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
1D |
||||||
KIP-10C |
59°38.3'E |
4300m |
RCB coring 780m sediment + 160m basement = 940 mbsf TD |
1180mbsf |
3 |
11.5 |
2.4 |
13.9 |
71°26.3'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
n/a |
||||||
KIP-10D |
59°31.9'S |
4300m |
RCB coring 700m sediment + 160m basement = 860 mbsf TD |
1100mbsf |
3 |
10.8 |
2.2 |
13.0 |
72°06.7'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
10C |
||||||
KIP-14C |
57°47.5'S |
4600m |
RCB coring 485m sediment + 160m basement = 645 mbsf TD |
885mbsf |
3 |
11.7 |
2.5 |
14.2 |
85°28.2'E |
Wireline Logs: Triple combo, FMS/DSI, DLL, WST |
n/a |
||||||
Note 1: Time estimates are preliminary only and will require later refinement if drilled. |
To Primary Site Summaries: Site KIP-2E