Table 2. Alternate Sites

Site

No.

Location

Lat/Long

Water

Depth

Operations Description

PPSP

Depth

Priority

Alt. For

Drilling

(days)

Logging

(days)

Total

On-site

                 

KIP-1D

5011.1'S

1460m

RCB coring 480m sediment + 160m basement = 640 mbsf TD

880mbsf

1

5.3

1.1

6.4

 

6356.2'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

n/a

     
                 

KIP-13A

5944.9'S

1646m

RCB coring 540m sediment + 160m basement = 700 mbsf TD

940mbsf

2

6.2

1.2

7.4

 

8419.9'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

13B

     
                 

KIP-6D

5650.0'S

1162m

RCB coring 450m sediment + 160m basement = 610 mbsf TD

850mbsf

2

5.0

1.1

6.1

 

6826.8'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

6C

     
                 

KIP-7C

5341.6'S

1109m

RCB coring 700m sediment + 160m basement = 860 mbsf TD

1100mbsf

2

6.3

1.2

7.5

 

7538.0'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

7B

     
                 

KIP-3C

5057.3'S

840m

RCB coring 460m sediment + 160m basement = 620 mbsf TD

860 mbsf

2

4.6

0.7

5.3

 

7037.2'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

3F

     
                 

KIP-2C

4617.0'S

2450m

RCB coring 370m sediment + 160m basement = 530 mbsf TD

770mbsf

2

5.7

0.9

6.6

 

6830.0'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

2E

     
                 

KIP-9C

3208.8'S

1215m

RCB coring 160m sediment + 160m basement = 320 mbsf TD

560mbsf

2

3.9

0.9

4.8

 

9709.9'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

9B

     
                 

KIP-1A

5008'S

1050m

RCB coring 400m sediment + 160m basement = 560 mbsf TD

800mbsf

3

4.6

0.7

5.3

 

6440.0'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

n/a

     
                 

KIP-1B

5018'S

2000m

RCB coring 360m sediment + 160m basement = 520 mbsf TD

760mbsf

3

5.5

0.8

6.3

 

6405.0'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

1A

     
                 

KIP-1E

5013.0'S

1550m

RCB coring 420m sediment + 160m basement = 580 mbsf TD

820mbsf

3

5.3

1.1

6.4

 

6354.5'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

1D

     
                 

KIP-10C

5938.3'E

4300m

RCB coring 780m sediment + 160m basement = 940 mbsf TD

1180mbsf

3

11.5

2.4

13.9

 

7126.3'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

n/a

     
                 

KIP-10D

5931.9'S

4300m

RCB coring 700m sediment + 160m basement = 860 mbsf TD

1100mbsf

3

10.8

2.2

13.0

 

7206.7'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

10C

     
                 

KIP-14C

5747.5'S

4600m

RCB coring 485m sediment + 160m basement = 645 mbsf TD

885mbsf

3

11.7

2.5

14.2

 

8528.2'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

 

n/a

     
                 
                 
Note 1: Time estimates are preliminary only and will require later refinement if drilled.    

To Primary Site Summaries: Site KIP-2E

To 183 Table of Contents