SITE SUMMARY
Site
: BON-9

To 185 Site BON-9 Track Line

To 185 Site BON-9 Seismic Line

Priority: 2
Position: 31°18.5ŽN, 143°2.5ŽE
Water Depth: 5875 m
Sediment Thickness: 600 mbsf
Target Drilling Depth: 900 mbsf
Approved Maximum Penetration: 900 mbsf
Seismic Coverage: Conrad 2005, Line 39

Objectives: The objectives of Site BON-9 are the same objectives as the primary site, BON-8A.

Drilling Program: Triple APC/XCB, MDCB, RCB

Logging and Downhole: Same as Site BON-8A

Nature of Rock Anticipated: Same as Site BON-8A

To 185 Site 801

To 185 Table of Contents