SITE SUMMARY
Site: BON-9
To 185 Site BON-9 Seismic Line
Priority:
2
Position: 31°18.5ŽN, 143°2.5ŽE
Water Depth: 5875 m
Sediment Thickness: 600 mbsf
Target Drilling Depth: 900 mbsf
Approved Maximum Penetration: 900 mbsf
Seismic Coverage: Conrad 2005, Line 39
Objectives: The objectives of Site BON-9 are the same objectives as the primary site, BON-8A.
Drilling Program: Triple APC/XCB, MDCB, RCB
Logging and Downhole: Same as Site BON-8A
Nature of Rock Anticipated: Same as Site BON-8A