SITE SUMMARY
Site: PIG-3B
To 185 Site PIG-3B Seismic Line
Priority:
2
Position: 18°39.78ŽN, 157°5.7ŽE
Water Depth: 5700 m
Sediment Thickness: 460 m
Target Drilling Depth: 1000 mbsf
Approved Maximum Penetration: mbsf
Seismic Coverage: MESOPAC II, Line 9
Objectives: The objectives of Site PIG-3B are the same objectives as the primary site, Site 801.
Drilling Program: Triple APC/XCB to >350 m
Logging and Downhole: Same as Site 801
Nature of Rock Anticipated: Same as Site 801