PROPOSED SITES

Details of the 19 approved sites are given in Table 1. The objectives and strategy are the same for all sites—that is, to recover a satisfactory sample of the basaltic basement as efficiently as possible from as many sites as possible.

To 187 Sampling Strategy

To 187 Table of Contents