SITE SUMMARIES

Site: AAD-23a
Seismic for AAD-23a

Priority: 1
Position: 42°33.19´S, 135°00.1´E
Water Depth: 4950 m
Sediment Thickness: Up to 200 m
Target Drilling Depth: 50 m into basement
Approved Maximum Penetration: 250 m
Seismic Coverage: BMRG05, 1800-1959 GMT, 19 Jan. 1996, shot 225

Objectives: The objective of Site AAD-23a is to recover basement samples for geochemical analysis in the minimum time possible.

Drilling Program: RCB to ~50 m basement

Logging and Downhole Operations: None

Nature of Rock Anticipated: Pelagic ooze, basalt.

To 187 Site Summary AAD-27a

To 187 Table of Contents