Leg 190 - Nankai Trough Accretionary Prism (Proposal No. 445-6) |
Operations Plan and Time Estimate for Primary Sites |
Revision: 7 Date: 27 Jan 00 |
|
|
|
|
|
|
|
|
|
|
Site |
Location |
Water |
Operations Description |
Days |
Transit |
Drilling |
Logging |
Total |
No. |
Lat/Long |
Depth |
per hole |
(days) |
(days) |
(days) |
On-site |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Guam |
13°27'N |
|
Transit 1244.2 nmi from Guam to ENT-01A |
|
|
4.9 |
|
|
|
|
144°38'E |
|
Seismic survey on approach to site |
|
|
0.30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
ENT-01A |
32°14.14'N |
4760 m |
Hole A: APC core to 125 mbsf, XCB to 350 mbsf |
|
4.6 |
|
10.2 |
1.8 |
12.0 |
|
135°01.87'E |
|
Oriented APC, ~2 ea Adara, ~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
Hole B: Drill to 340 mbsf, RCB to 700 mbsf |
|
7.3 |
|
|
|
|
|
|
|
~3 ea DVTP, ~ 4 ea WSTP |
|
|
|
|
|
|
|
|
|
Log - triple-combo, FMS-sonic, VSP check shot |
|
|
|
|
|
|
|
|
|
NOTE: PPSP approved depth is 700 mbsf |
|
|
|
|
|
|
|
|
|
Transit 7.3 nmi from ENT-01A to ENT-03A |
|
|
0.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
ENT-03A |
32°20.30'N |
4730 m |
Hole A: APC to 125 mbsf, XCB to 350 mbsf |
|
4.4 |
|
15.1 |
0.0 |
15.1 |
|
134°57.25'E |
|
Oriented APC, ~2 ea Adara, ~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
Hole B: Drill to 340 mbsf, RCB core to 1150 mbsf |
|
10.7 |
|
|
|
|
|
|
|
1 ea DIC, ~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
NOTE: PPSP approved depth is 1160 mbsf |
|
|
|
|
|
|
|
|
|
Transit 22.6 nmi from ENT-03A to ENT-07A |
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
ENT-07A |
32°36.03'N |
3022 m |
Hole A: APC to 200 mbsf, XCB to 400 mbsf |
|
3.3 |
|
3.3 |
0.0 |
3.3 |
|
134°38.42'E |
|
Oriented APC, ~2 ea Adara, ~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
NOTE: PPSP approved depth is 800 mbsf |
|
|
|
|
|
|
|
|
|
Transit 2.6 nmi from ENT-07A to ENT-06A |
|
|
0.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
ENT-06A |
32°34.49'N |
3045 m |
Hole A: APC core to 200 mbsf, XCB to 500 mbsf |
|
4.1 |
|
8.6 |
0.0 |
8.6 |
|
134°40.31'E |
|
Oriented APC, ~2 ea Adara, ~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
Hole B: Drill to 490 mbsf, RCB to 800 mbsf |
|
4.4 |
|
|
|
|
|
|
|
~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
NOTE: PPSP approved depth is 800 mbsf |
|
|
|
|
|
|
|
|
|
Transit 61.8 nmi from ENT-06A to WNT-01A |
|
|
0.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
WNT-01A |
31°43.87'N |
4850 m |
Hole A: Drill 0 to 300 mbsf, RCB 300 mbsf to 700 mbsf |
|
6.7 |
|
6.7 |
0.0 |
6.7 |
|
133°56.85'E |
|
~3 ea DVTP, ~4 ea WSTP |
|
|
|
|
|
|
|
|
|
NOTE: PPSP approved depth is 1200 mbsf |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Yokohama |
35°28'N |
|
Transit 374.8 nmi from WNT-01A to Yokohama |
|
|
1.6 |
|
|
|
|
139°38'E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subtotals |
7.3 |
43.9 |
1.8 |
45.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL DAYS: |
53.0 |