SITE SUMMARIES
Priority: 1
Position: 32°20.30'N, 134°57.25'E
Water Depth: 4730 m
Sediment Thickness: 1150 m
Target Drilling Depth: 1150 m
Approved Maximum Penetration: 1160 m
Seismic Coverage: Fred Moore Line NT62-8, SP 1641 (CDP 833); 1999 3-D seismic survey,
Line 141, SP 165
Objectives: The objectives of ENT-03A are to drill through the protothrust zone to:
Drilling Program: APC, XCB, and RCB
Logging: None
Downhole Tools: APC core orientation, Adara and DVTP temperature, WSTP water samples
Nature of Rock Anticipated: Interbedded hemipelagic mud/silty-sandy turbidites, tuff