SITE SUMMARIES
Priority: 2
Position: 32°29.46'N, 134°46.48'E
Water Depth: 4125 m
Sediment Thickness: 3000 m
Target Drilling Depth: 800 m
Approved Maximum Penetration: 800 m
Seismic Coverage: 3-D seismic survey in 1999, Line 141-2D SP 642, crossing line 842
Objectives: The objectives of Site ENT-05A are to:
Drilling Program: APC, XCB, and RCB
Logging: None
Downhole Tools: APC core orientation, Adara and DVTP temperature, WSTP water samples
Nature of Rock Anticipated: Interbedded hemipelagic mud/silty-sandy turbidites