SITE SUMMARIES
Priority: 1
Position: 32°36.03'N, 134°38.42'E
Water Depth: 3022 m
Sediment Thickness: 3000 m
Target Drilling Depth: 800 m
Approved Maximum Penetration: 800 m
Seismic Coverage: 3-D seismic survey in 1999, Line 141-2D SP 992, crossing line 1192
Objectives: The objectives of Site ENT-07A are to:
Logging: None
Downhole Tools: APC core orientation, Adara and DVTP temperature, WSTP water samples
Nature of Rock Anticipated: Interbedded hemipelagic mud/silty-sandy turbidites