Operations Plan and Time Estimate for Primary and Alternate Sites | Table of Contents
Figure 6. Seismic control (black lines) for proposed drilling sites. Sonobuoy and ocean-bottom seismometer locations (solid triangles) on the OJP are shown, as are ODP Sites 803-807 and DSDP Sites 64, 288, and 298/586 (solid circles represents sites that penetrated igneous basement and open circles ones that penetrated sediment only). Proposed sites are indicated by squares (primary sites-lighter gray shading [web version red]; alternate sites are black). Line KH98-1: R/V Hakuho Maru, Line KH98-1 Leg 2 (1998); Line EW-9511: R/V Maurice Ewing 9511 (1995); Line TW-11: R/V Thomas Washington 11 (1988); Charcot: R/V Jean Charcot (1986). Map is from GEBCO charts.
Operations Plan and Time Estimate for Primary and Alternate Sites | Table of Contents