SITE SUMMARIES (continued)
Site: PCM-7A
Priority: Alternate for, or supplement to, PCM-3A
Position: 3°43.600'S, 151°40.325'E
Water Depth: 1700 m
Sediment Thickness: 0 m
Target Drilling Depth: to bit destruction
Approved Maximum Penetration: Not reviewed by SSP, center of Satanic Mills chimney field
Seismic Coverage: Sonne SO-94/SCS Leg 2, abeam CDP 1715
Objectives: The objectives of PCM-7A are to determine the
1.Subsurface alteration and mineralization patterns, and their variation with depth, beneath an area of focused, high-temperature venting;
2. Hydrothermal fluid pathways; and
3. Thickness of exhalative sulfides, and nature of mound beneath chimneys.
Drilling Program: Bare rock spud, reentry may be required to meet depth objectives. Alternate
drilling strategy may be employed based on the results of operations at Site PCM-2A. Options
include bare-hole reentry, free-fall funnel deployment and/or a reentry cone.
Logging and Downhole: Fluid and temperature sampling as required. Triple combo, FMS/sonic,
logging while drilling.
Nature Of Rock Anticipated: Fresh and altered dacite lava, mineralized veins, possible massive
sulfide intervals.