LEG 193 - EASTERN MANUS BACK ARC BASIN (P479-Rev2)
ALTERNATE SITES
| Site | Location | Water | Projected Operations Plan | Transit | Drilling | Logging | Total |
| No. | Lat/Long | Depth | (depths in mbsf) | (days) | (days) | (days) | On-site |
| PCM-4A | 3°44.445'S | 2139m | Hole A: RCB to 300 mbsf | n/a | 9.0 | 1.4 | 10.4 |
| (4th priority | 151°40.755'E | Log w/triple combo, FMS-DSI, and temp tool/fluid sampling | |||||
| site) | |||||||
| PCM-5A | 3°43.115'S | 1647m | Hole A: RCB to 700 mbsf. Drilling plan TBD based upon results | n/a | 20.4 | 1.6 | 22.0 |
| (alternate to | 151°41.084'E | at PCM-2A. Possible bare hole reentry or FFF or reentry cone | |||||
| PCM-1A) | Log w/triple combo, FMS-DSI, and temp tool/fluid sampling | ||||||
| PCM-6A | 3°43.433'S | 1725m | Hole A: RCB to 700 mbsf. Drilling plan TBD based upon results | n/a | 20.4 | 1.6 | 22.0 |
| (alternate to | 151°41.727'E | at PCM-2A. Possible bare hole reentry or FFF or reentry cone | |||||
| PCM-1A) | Log w/triple combo, FMS-DSI, and temp tool/fluid sampling | ||||||
| PCM-7A | 3°43.600'S | 1700m | Hole A: RCB to TBD mbsf. Drilling plan TBD based upon results | n/a | 8.6 | 1.2 | 9.8 |
| (alternate to | 151°40.325'E | at PCM-2A. Possible bare hole reentry or FFF or reentry cone | |||||
| PCM-3A) | Log w/triple combo, FMS-DSI, and temp tool/fluid sampling | ||||||
| PCM-8A | 3°43.790'S | 1690m | Hole A: RCB to 300 mbsf. Drilling plan TBD based upon results | n/a | 8.6 | 1.2 | 9.8 |
| (alternate to | 151°40.015'E | at PCM-2A. Possible bare hole reentry or FFF or reentry cone | |||||
| PCM-3A) | Log w/triple combo, FMS-DSI, and temp tool/fluid sampling |
DATE: 25 April 2000
FILE: I:\ DATA \ DSD_INFO \ Leg193\193ProjB.xls
BY: M. A. Storms