Site Summaries: Site KS-1 | Table of Contents

Table 2. Leg 195 Alternate Drill Sites

Site Location Water Operations Description   Transit Drilling Logging Total
No.   Depth           On-site
  (Lat/Long) (mbrf) (mbsf)   (days) (days) (days) (days)
                 
KS-1 24°48.24'N 1288 A: Oriented APC to ~250 mbsf, with 5 Adara [53.75 hrs]   2.2 0.9 4.7
(Alternate 122°30.0'E   temperature measurements, XCB to ~410 mbsf          
Site off     wireline log w/triple combo, FMS-sonic, MST [22.0 hrs]        
Taiwan)                
      B: Non-oriented APC to ~250 mbsf [17.25 hrs]   0.7    
                 
      C: Non-oriented APC to ~250 mbsf [22.25 hrs]   0.9    

Site Summaries: Site KS-1 | Table of Contents