SITE SUMMARIES (continued)
Site: ENT-08A
Priority: 3
Position: 32°40.68'N, 134°32.70'E
Water Depth: 2437 m
Sediment Thickness: 3000 m
Target Drilling Depth: 800 mbsf
Approved Maximum Penetration: 800 mbsf
Seismic Coverage: 3-D seismic survey in 1999, Line 141-2D SP 1257, crossing Line 1460
Objectives: The objectives of Site ENT-08A are to
Logging and Downhole Tools: LWD, DVTP, and WSTP
Nature of Rock Anticipated: Interbedded hemipelagic mud/silty-sandy turbidites