Site Summaries: Site WNT-02A | Table of Contents

SITE SUMMARIES (continued)

Site: WNT-01A

Site Location Map

Seismic Line

Priority: 3
Position: 31°43.87'N, 133°56.85'E
Water Depth: 4850 m
Sediment Thickness: 1150 m
Target Drilling Depth: 700 m
Approved Maximum Penetration: 1200 m
Seismic Coverage: Fred Moore Line NT62-2, SP 343 (CDP 1706)


Objectives: The objectives of Site WNT-01A are to

1. Contrast deformational and fluid flow behavior along the strike

2. Determine the structural and hydrologic evolution of the décollement zone

3. Determine the fluid flow paths and chemical gradients

4. Determine the spatial distribution and temporal progression of the deformation


Drilling Program: APC/XCB and/or RCB coring


Logging and Downhole Tools: LWD, DVTP, and WSTP


Nature of Rock Anticipated:
Interbedded hemipelagic mud/silty-sandy turbidites

Site Summaries: Site WNT-02A | Table of Contents