SITE SUMMARIES (Continued)
Site: SHAT-7
Priority: 2
Position: 37°9.90´N, 158°40.529´E
Water Depth: 4125 m
Sediment Thickness: 485 m
Target Drilling Depth: 200 m
Approved Maximum Penetration: 685 mbsf
Seismic Coverage: Sager Line 9, part 2
Objective: The objective of Site SHAT-7 is to core a Paleogene and Upper Cretaceous
sequence for paleoceanographic study.
Drilling Program: Double APC.
Logging and Downhole: None.
Nature of Rock Anticipated: Red clay, calcareous ooze, and chalk.