Site Summaries | Table of Contents
Table 3. Present Leg 199 drilling program and additional coring and logging programs to be
used as an operational guide if time becomes available during the leg.
Proposed Site | Present Leg 199 Minimum Drilling Program | Better Drilling Program | Best Drilling Program | Priority |
PAT-8C | 3APC/1XCB + Triple combo, MGT, + FMS-sonic logs | 3APC/2XCB + Triple combo, MGT, + FMS sonic logs | 3APC/2XCB + Triple combo, MGT, FMS-sonic logs +WST logs | 1 |
PAT-9D | 2APC/1XCB Triple combo, MGT, + FMS-sonic logs | 3APC/1XCB Triple combo, MGT, + FMS sonic logs | 3APC/1XCB + Triple combo, MGT, FMS-sonic logs, + WST logs | 2 |
PAT-10B | 1APC/1XCB | 2APC | 3APC + Triple combo, MGT, + FMS-sonic logs | |
PAT-12C | 2APC/1XCB | 3APC/1XCB | 3APC/1XCB | 3 |
PAT-15D | 1APC/1XCB | 2APC/1XCB | 3APC/1XCB | 2 |
PAT-17C | 3APC/1XCB + Triple combo, MGT, + FMS-sonic logs | 3APC/1XCB + Triple combo, MGT, + FMS sonic logs | 3APC/2XCB + Triple combo, MGT, FMS-sonic + WST logs | 1 |
PAT-19A | 2APC/1XCB | 3APC/1XCB | 3APC/1XCB | 3 |
PAT-26 | 2APC/1XCB | 2APC/1XCB + Triple combo, MGT, + FMS sonic logs | 3APC/1XCB Triple combo, MGT, + FMS sonic logs | 1 |