Site Summaries: Site 848 | Table of Contents

Site Summaries

Site: ODP Site 847

Priority: Alternate
Position: 0°11.59'N, 95°19.23'W
Water Depth: 3334 m
Sediment Thickness: 295 m
Target Drilling Depth: 295 m
Approved Maximum Penetration: Requested same penetration as requested for Leg 138.
Seismic Coverage: Thomas Washington station 11, 0854UTC, 16 September 1989.
See seismic line.

Objective: Control site for comparison to proposed Sites EQP-1A and EQP-2A. Normal open ocean site, sulfate concentrations decline 1 to 2 mmol downhole and they contain no geochemical evidence of subsurface flow.

Drilling Program: TBD

Logging and Downhole Program: TBD

Nature of Rock Anticipated: Nannofossil ooze and diatom nannofossil ooze.

Site Summaries: Site 848 | Table of Contents