Next Section | Table of Contents

Table T3. Leg 204 alternate sites.

Site
Water depth
(m)
Latitude (°N)
Longitude (°W)
PPSP-approved penetration(mbsf)
Operations description
Coring and LWD
(days)
Total
Site
(days)

HR5
1046
44.586096°
260
Hole A: Drill LWD hole to 260 mbsf
1.2



125.093815°

Hole B: APC to ~150 mbsf, XCB to ~260 mbsf;
Adara, DVTP
1.5





Hole C: APC to ~150 mbsf, XCB to ~260 mbsf;
PCS, Hyacinth
2.4
5.1

HR6
861
44.574176°
60
Hole A: Drill LWD hole to 60 mbsf
0.8



125.152910°

Hole B: APC to ~60 mbsf;
Adara
0.6





Hole C: APC to ~60 mbsf;
PCS, Hyacinth
1.7
3.1

HR1b
931
44.586056°
150
Hole A: Drill LWD hole to 150 mbsf
1.0


125.119213°

Hole B: APC to ~130 mbsf, XCB to ~150 mbsf;
Adara, DVTP
0.9





Hole C: APC to ~130 mbsf, XCB/PCS to ~150 mbsf;
Hyacinth
1.7
3.6

Next Section | Table of Contents