Site Summaries | Table of Contents

Table 2. Leg 205 Site Time Estimate for Alternate Sites.

Site
No.
Location
Lat./Long.
Water
Depth
Operations Description On-Site
(days)
 
Alt. 1039R
Basement
9.64° N 4352 Set reentry cone w/ 60 m 16" casing 16.6
86.20° W m Drill 60 - 350 mbsf, RCB core 350 - 600 mbsf (80 m basement)
      Log - Triple Combo, FMS-Sonic 350 - 600 mbsf
      Set 10-3/4" casing to 530 mbsf
      Install osmosampler screen @ 550 mbsf w/ packer @ 540 mbsf
      Install osmosampler(s) on wireline
      Deploy ROV/submersible platform
         
Alt. 1040R
Under Thrust
9.66° N 4177 Set reentry cone w/ 60 m 16" casing 11.1
86.18° W m Drill 60 - 160 mbsf, RCB core 160 - 435 mbsf
      Set 10-3/4" casing to 380 mbsf
      Install osmosampler screen @ 400 mbsf w/ packer @ 390 mbsf
      Install osmosampler on wireline
      Deploy ROV/submersible platform
         
Alt. 1040R
Decollement
9.66° N 4177 Set reentry cone w/ 60 m 16" casing 7.0
86.18° W m Set 10-3/4" casing to 310 mbsf
      RCB core 315 - 359 mbsf
      Install osmosampler screen @ 349 mbsf w/ packer @ 320 mbsf
      Install osmosampler on wireline
      Deploy ROV/submersible platform
         
Alt. 1040R-D
Underthrust
9.67° N 4125 Set reentry cone w/ 60 m 16" casing 7.0
86.18° W m Set 10-3/4" casing to 390 mbsf
      Install osmosampler screen @ 410 mbsf w/ packer @ 400 mbsf
      Install osmosampler on wireline
      Deploy ROV/submersible platform
         
Alt. 1043R-A
Osmo Install
9.65° N 4313 Set reentry cone w/ 60 m 16" casing 6.6
86.19° W m Set 10-3/4" casing to 170 mbsf
      Install osmosampler screen @ 190 mbsf w/ packer @ 180 mbsf
      Install osmosampler on wireline
      Deploy ROV/submersible platform

Site Summaries| Table of Contents