Next Section | Table of Contents

Figure F9. Stacked, migrated section of MCS data from line 27, showing the primary drill Site GUATB-03C and crossing positions of lines 21–23. The bright reflector at 5.5–5.7 s near the line 21 crossing may be a thrust fault, and site selection decisions avoided this feature.

Next Section | Table of Contents