Figure F9. Stacked, migrated section of MCS data from line 27, showing the primary drill Site GUATB-03C and crossing positions of lines 2123. The bright reflector at 5.55.7 s near the line 21 crossing may be a thrust fault, and site selection decisions avoided this feature.