Next Figure | Table of Contents

Figure F2. Seismic grid shot during survey Meteor 49-4 (solid lines) with industry multichannel tracklines (dashed lines) over the Demerara Rise, with proposed Leg 207 drill site locations (primary sites in bold).

Next Figure | Table of Contents