Priority: 1 Target Drilling Depth: 970 mbsf Approved Maximum Penetration: 970 mbsf Seismic Coverage: Primary line GeoB01-211, crossing line GeoB01-219
Objective: The primary objective for Site DR-2 is to sample Cretaceous sediments from the shallowest part of the depth transect.
Drilling Program: Double APC/XCB to refusal, RCB from XCB refusal depth to 970 mbsf.
Logging Program: Triple combo, FMS-sonic, and checkshot.
Nature of Rock Anticipated: Foraminifer-nannofossil ooze, chalk, carbonaceous claystone, and black shales.