Priority: 1 Target Drilling Depth: 560 mbsf Approved Maximum Penetration: 600 mbsf Seismic Coverage: Primary line GeoB01-219, crossing line GeoB01-208
Objective: The primary objective of Site DR-5B is to recover Paleogene and Cretaceous strata at an intermediate position along the depth transect.
Drilling Program: Double APC/XCB to refusal (~560 mbsf).
Logging Program: Triple combo and FMS-sonic.
Nature of Rock Anticipated: Foraminifer-nannofossil ooze, chalk, carbonaceous claystone, and black shales.