Priority: 3 Target Drilling Depth: 600 mbsf Approved Maximum Penetration: 600 mbsf Seismic Coverage: Primary line GeoB01-213, crossing line GeoB01-208
Objective: The objective of Site DR-7B is to recover Neogene through Cretaceous sediments from the shallower end of the depth transect (i.e., alternate to Site DR-2).
Drilling Program: Double APC/XCB to refusal, RCB from XCB refusal depth to 600 mbsf.
Logging Program: Triple combo and FMS-sonic.
Nature of Rock Anticipated: Foraminifer-nannofossil ooze, chalk, carbonaceous claystone, and black shales.