Next Table | Table of Contents

Table T2. Time estimates for Leg 209 wireline logging.

Site Tool strings Hole depth* (mbsf) Time (hr)
MAR-4S Triple combo and FMS/sonic 100
MAR-3S Triple combo and FMS/sonic 100 13.8
MAR-1S Triple combo and FMS/sonic 100 13.9
MAR-1N Triple combo and FMS/sonic 100 15.3
MAR-2N Triple combo and FMS/sonic 100 15.2
MAR-3N Triple combo and FMS/sonic 100 14.6
MAR-2S Triple combo and FMS/sonic 100 14.8
Note: * = hole depths are estimated based on potential bit life for a single hole penetration.

Next Table | Table of Contents