Next Figure | Table of Contents

Figure F7. Ewing MCS profiles crossing at proposed drill Sites NNB-01A, NNB-01B, and NNB-01C. Locations are shown in Figure F3. The main profile (2MCS) is shown in Figure F5. Arrows at the bottom indicate depths of basement picks. Holes are planned for at least 100-m basement penetration. CMP = common midpoint.

Next Figure | Table of Contents