Figure F8. Ewing MCS crossing lines for proposed drill Sites NNB-03A, NNB-04A, and NNB-05A and profile through proposed Site NNB-06B. Locations are shown in Figure F3. Arrows at the bottom indicate basement picks. Holes are planned for at least 100-m basement penetration. CMP = common midpoint.