Press to Close

Table T1. Chart used to calculate (1) travel time for PFT to drill bit based on mud pumping rate and length of drill string, and (2) HPLC pumping rate to maintain an ~1 mg/L PFT solution in the drill string.
 
Strokes*
(min-1)
Liter
(min-1)
HPLC
Pump
(mL min-1)
Time of PFT to drill bit with pipe length (m)
5900
(min)
6000
(min)
6100
(min)
6200
(min)
6300
(min)

5

98

0.05

602

612

622

633

643

10

196

0.11

301

306

311

316

321

15

294

0.16

201

204

207

211

214

20

392

0.22

151

153

156

158

161

25

490

0.27

120

122

124

127

129

30

588

0.33

100

102

104

105

107

35

686

0.38

86

87

89

90

92

40

784

0.44

75

77

78

79

80

45

882

0.49

67

68

69

70

71

50

980

0.54

60

61

62

63

64

55

1078

0.60

55

56

57

58

58

60

1176

0.65

50

51

52

53

54

65

1274

0.71

46

47

48

49

49

70

1372

0.76

43

44

44

45

46

75

1470

0.82

40

41

41

42

43

80

1568

0.87

38

38

39

40

40

85

1666

0.93

35

36

37

37

38

90

1764

0.98

33

34

35

35

36

95

1862

1.03

32

32

33

33

34

100

1960

1.09

30

31

31

32

32

Notes: PFT = perfluorocarbon tracer; HPLC = high pressure liquid chromatography; ppm = parts per million. * = mud pump strokes were recorded on the rig floor. 1 stroke = 19.6 L.

Press to Close