Figure 1. CORK schematic.

Figure 2. Lower portion of CORK with seal elements being prepared for installation.

Figure 3. ROV platform being assembled in the moonpool.

Figure 4. Subsea photograph of one of the first CORKs installed during Leg 139 in 1991.