REFERENCES

Foss, G.N., and Julson, B.D., 1993. Revised hydrogen sulfide drilling contingency plan—JOIDES Resolution. ODP Tech. Note, 19.

Howard, S.P., and Reudelhuber, D.H., 1991. Hydrogen sulfide—high temperature drilling contingency plan. ODP Tech. Note, 16.

NEXT