About ODP

JOIDES Resolution

Drilling Operations

Bridge deck/Level 6

Fo'c'sle deck/Level 5

Main deck/Level 4

Upper 'tween deck/Level 3

Lower 'tween deck/Level 2

Hold deck/Level 1

Lab house top/Level 7

Poop deck/Fantail

Fo'c'sle deck/Forward

Shipboard Laboratories

JOIDES Resolution Tour: Lower 'Tween Deck/Level 2

Cross-section of the JOIDES Resolution

The gym contains several stationary bikes and rowing machines,two stairmaster, a good (for a ship!) selection of weights/machines, a ping pong table, steps for step aerobics, punching bags, and an audio-video system. The gym is one of only a few places on the ship to get away from the 12-hour, 7 day-a-week, two-month straight strenuous work schedule.


This deck contains large refrigerators to store core samples as well as a freezer to hold those samples which require frozen storage.



Modified on .