-
Position: 4°47.1198'S, 10°4.4989'E
-
Start hole: 1950 hr, 23 August 1997
-
End hole: 2340 hr, 24 August 1997
-
Time on hole: 27.83 hr
-
Seafloor (drill pipe measurement from rig floor, mbrf): 3007.0
-
Total depth (drill pipe measurement from rig floor, mbrf): 3208.0
-
Distance between rig floor and sea level (m): 11.3
-
Water depth (drill pipe measurement from sea level, m): 2995.7
-
Penetration (mbsf): 201
-
Coring totals:
-
Type: APC
-
Number: 22
-
Cored: 201 m
-
Recovered: 213.75 m (106.34%)
-
Lithology:
-
Unit I: Greenish gray to olive-gray nannofossil-bearing diatomaceous clay and diatomaceous clay
1Examples
of how to reference the whole or part of this volume can be found under
"Citations"
in the preliminary pages of the volume.
2Shipboard
Scientific Party addresses can be found under "Shipboard
Scientific Party" in the preliminary pages of the volume.
Ms
175IR-103
Reproduced online: 12 April 2004