HOLE 1075B
-
Position: 4°47.1197'S, 10°4.5025'E
-
Start hole: 2340 hr, 24 August 1997
-
End hole: 1810 hr, 25 August 1997
-
Time on hole: 18.50 hr
-
Seafloor (drill pipe measurement from rig floor, mbrf): 3006.5
-
Total depth (drill pipe measurement from rig floor, mbrf): 3211
-
Distance between rig floor and sea level (m): 11.3
-
Water depth (drill pipe measurement from sea level, m): 2995.2
-
Penetration (mbsf): 204.5
-
Coring totals:
-
Type: APC
-
Number: 22
-
Cored: 204.5 m
-
Recovered: 215.03 m (105.15%)
-
Lithology:
-
Unit I: Greenish gray to olive-gray nannofossil-bearing diatomaceous clay and diatomaceous clay