HOLE 1075B

Position: 4°47.1197'S, 10°4.5025'E
Start hole: 2340 hr, 24 August 1997
End hole: 1810 hr, 25 August 1997
Time on hole: 18.50 hr
Seafloor (drill pipe measurement from rig floor, mbrf): 3006.5
Total depth (drill pipe measurement from rig floor, mbrf): 3211
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2995.2
Penetration (mbsf): 204.5
Coring totals:
Type: APC
Number: 22
Cored: 204.5 m
Recovered: 215.03 m (105.15%)
Lithology:
Unit I: Greenish gray to olive-gray nannofossil-bearing diatomaceous clay and diatomaceous clay

NEXT