Table T1. Coring summary, Site 1149.

Core Date
(1999)
Ship local time Depth (mbsf)         Recovery (%) Comments
Length (m)
Top Bottom Cored Recovered
185-1149A-









1H 24 May 0245 0.0 4.2
4.2 4.23
100.7
2H 24 May 0430 4.2 13.7
9.5 9.95
104.7 Drill string acceleration
3H 24 May 0550 13.7 23.2
9.5 9.81
103.3 Bead test for microbiological contamination study
4H* 24 May 0740 23.2 32.7
9.5 9.91
104.3 Temperature recording
5H 24 May 0855 32.7 42.2
9.5 9.55
100.5
6H 24 May 1035 42.2 51.7
9.5 9.87
103.9 Temperature recording; Bead test and PFT test for microbiological contamination study
7H 24 May 1150 51.7 61.2
9.5 9.58
100.8
8H 24 May 1320 61.2 70.7
9.5 9.94
104.6 Temperature recording
9H 24 May 1530 70.7 80.2
9.5 9.38
98.7 Bead test and PFT test for microbiological contamination study
10H 24 May 1800 80.2 89.7
9.5 9.82
103.4 Drill string acceleration
11H 24 May 1950 89.7 99.2
9.5 9.63
101.4 PFT test for microbiological contamination study
12H 24 May 2110 99.2 108.7
9.5 9.93
104.5 Bead test for microbiological contamination study
13H 24 May 2230 108.7 118.2
9.5 9.46
99.6
14H 24 May 2340 118.2 127.7
9.5 10.05
105.8
15H 25 May 0055 127.7 137.2
9.5 9.85
103.7
16H 25 May 0210 137.2 146.7
9.5 9.89
104.1
17H 25 May 0325 146.7 156.2
9.5 9.89
104.1
18H 25 May 0440 156.2 164.4
8.2 8.34
101.7
19X 25 May 0650 164.4 169.8
5.4 1.79
33.2
20X 25 May 0820 169.8 179.1
9.3 2.06
22.2
21X 25 May 1010 179.1 188.7
9.6 1.21
12.6
22X 25 May 1305 188.7 190.9
2.2 0.00
0.0
23N 25 May 1625 190.9 191.2
0.3 0.30
100.0 Motor driven core barrel
Coring totals:




191.2 174.44
91.2
185-1149B-










26 May 2300 ***Drilled from 0.0 to 151.1 mbsf***
1W 27 May 0040 151.1 160.6
9.5 3.79
39.9
2R 27 May 0315 160.6 170.3
9.7 0.76
7.8
3R 27 May 0510 170.3 180.0
9.7 9.73
100.3
4R 27 May 0735 180.0 189.4
9.4 0.33
3.5
5R 27 May 0950 189.4 198.7
9.3 0.12
1.3
6R 27 May 1145 198.7 203.7
5.0 0.32
6.4
7R 27 May 1335 203.7 208.1
4.4 0.43
9.8
8R 27 May 1615 208.1 217.4
9.3 0.09
1.0
9R 27 May 1825 217.4 226.8
9.4 0.40
4.3
10R 27 May 2035 226.8 236.3
9.5 0.21
2.2
11R 27 May 2305 236.3 245.4
9.1 0.22
2.4
12R 28 May 0110 245.4 254.6
9.2 0.14
1.5
13R 28 May 0325 254.6 263.9
9.3 0.12
1.3
14R 28 May 0600 263.9 273.3
9.4 0.07
0.7
15R 28 May 0915 273.3 282.3
9.0 0.03
0.3
16R 28 May 1625 282.3 292.0
9.7 1.11
11.4
17R 28 May 2000 292.0 301.6
9.6 0.22
2.3
18R 28 May 2250 301.6 311.3
9.7 1.10
11.3
19R 29 May 0125 311.3 320.9
9.6 1.27
13.2
20R 29 May 0405 320.9 330.5
9.6 1.22
12.7
21R 29 May 0655 330.5 340.1
9.6 0.17
1.8
22R 29 May 0910 340.1 349.7
9.6 0.98
10.2
23R 29 May 1135 349.7 359.2
9.5 0.27
2.8
24R 29 May 1410 359.2 368.7
9.5 0.66
6.9
25R 29 May 1650 368.7 378.1
9.4 0.25
2.7
26R 29 May 1905 378.1 387.6
9.5 0.73
7.7
27R 29 May 2200 387.6 397.1
9.5 0.89
9.4
28R 30 May 0345 397.1 406.8
9.7 2.37
24.4
29R 30 May 1050 406.8 416.4
9.6 3.16
32.9
30R 30 May 1630 416.4 426.0
9.6 3.19
33.2
31R 30 May 2215 426.0 435.6
9.6 1.25
13.0
32R 31 May 0420 435.6 445.2
9.6 1.12
11.7
Coring totals:




294.1 36.72
12.5
Drilled:




151.1



Total:




445.2



185-1149C-









1W 3 June 1610 0.0 237.0
237.0 1.63
0.7
2W 3 June 2200 237.0 283.6
46.6 0.22
0.5
3R 4 June 0320 283.6 293.2
9.6 0.46
4.8
4R 4 June 0840 293.2 302.8
9.6 0.25
2.6
5R 4 June 1715 302.8 312.4
9.6 0.30
3.1
6R 4 June 1930 312.4 322.0
9.6 0.48
5.0
7W 5 June 0200 322.0 388.2
66.2 0.46
0.7
8R 5 June 1010 388.2 397.9
9.7 0.96
9.9
9R 5 June 2205 397.9 407.5
9.6 1.00
10.4
10R 6 June 0330 407.5 417.1
9.6 1.60
16.7
11R 6 June 1235 417.1 426.7
9.6 1.34
14.0
Coring totals:




426.7 8.70
2.0
185-1149D-









1W 8 June 0610 ***Drilled from 0.0 to 272.2 mbsf***
2R 8 June 0830 272.2 281.6
9.4 0.29
3.1
3R 8 June 1040 281.6 290.9
9.3 0.31
3.3
4R 8 June 1330 290.9 300.3
9.4 0.63
6.7
5R 8 June 1945 300.3 310.0
9.7 0.30
3.1
6R 9 June 0255 310.0 319.7
9.7 2.07
21.3
7R 9 June 0745 319.7 329.3
9.6 2.84
29.6
8R 9 June 1755 329.3 338.8
9.5 3.03
31.9
9R 10 June 0045 338.8 348.4
9.6 2.75
28.7
10R 10 June 0645 348.4 357.9
9.5 2.01
21.2 Bead test for microbiological contamination study
11R 10 June 1225 357.9 367.4
9.5 4.60
48.4 Bead test for microbiological contamination study
12R 10 June 1655 367.4 377.0
9.6 0.60
6.3 Bead test for microbiological contamination study
13R 10 June 2215 377.0 386.6
9.6 1.27
13.2 Bead test for microbiological contamination study
14R 11 June 1030 386.6 396.3
9.7 0.36
3.7 Bead test for microbiological contamination study
15R 11 June 1645 396.3 405.9
9.6 0.80
8.3 Bead test for microbiological contamination study
16R 11 June 2225 405.9 415.5
9.6 2.69
28.0 Bead test for microbiological contamination study
17R 12 June 0515 415.5 425.1
9.6 1.61
16.8
18R 12 June 1125 425.1 434.7
9.6 1.59
16.6
19R 12 June 1610 434.7 440.4
5.7 1.00
17.5
Coring totals:




168.2 29.94
17.8
Drilled:




272.2



Total:




440.4



Notes: * = APC cores were oriented in azimuth beginning with Core 4H. PFT = perfluorocarbon tracer. This table is also available in ASCII format.