Dip profile 801 and strike profile 910 (in travel-time, see accompanying track map for locations), which cross at drillsite 9B-3, the third of three approved sites within the 9B "hazards" grid. Proposed TD to early Oligocene horizon o1 is shown by the vertical line. All mapped horizons are labelled. Distances between lines in the center of the grid are 150 m; outer grid lines are separated by 300 m.