Table 1. Primary Sites

Site

No.

Location

Lat/Long

Water

Depth

Operations Description

PPSP

Depth

Transit

(days)

Drilling

(days)

Logging

(days)

Total

On-site

                 

Fremantle

32.07°S

 

Transit 2031 nmi from Fremantle to KIP-13B @ 10.5 kt

 

8.1

     
 

115.44°E

             
                 

KIP-13B

59°42.0'S

1600m

RCB coring 595m sediment + 160m basement = 755 mbsf TD

995mbsf

 

6.5

1.2

7.7

 

84°16.4'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 70.6

         
                 
     

Transit 552 nmi from KIP-13B to KIP-6C @ 10.5 kt

 

2.2

     
                 

KIP-6C

56°50.0'S

1027m

RCB coring 215m sediment + 160m basement = 375 mbsf TD

615mbsf

 

3.8

0.9

4.7

 

68°05.6'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 54.7

         
                 
     

Transit 271 nmi from KIP-6C to KIP-7B @ 10.5 kt

 

1.1

     
                 

KIP-7B

53°33.1'S

1168m

RCB coring 685m sediment + 160m basement = 845 mbsf TD

1085mbsf

 

6.3

1.2

7.5

 

75°58.5'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 76.3

         
                 
     

Transit 200 nmi from KIP-7B to KIP-3F @ 10.5 kt

 

0.8

     
                 

KIP-3F

51°04.0'S

740m

RCB coring 350m sediment + 160m basement = 510m TD

750 mbsf

 

4.1

0.9

5.0

 

70°46.2'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 56.5

         
                 
     

Transit 320 nmi from KIP-3F to KIP-2E @ 10.5 kt

 

1.3

     
                 

KIP-2E

46°16.6'S

2450m

RCB coring 350m sediment + 160m basement = 510 mbsf TD

750 mbsf

 

5.6

1.1

6.7

 

68°29.5'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 56.5

         
                 
     

Transit 1596 nmi from KIP-2E to KIP-9B @ 10.5 kt

 

6.3

     
                 

KIP-9B

32°07.3'S

1240m

RCB coring 160m sediment + 160m basement = 320 mbsf TD

560mbsf

 

3.9

0.9

4.8

 

97°00.4'E

 

Wireline Logs: Triple combo, FMS/DSI, DLL, WST

         
     

Note: Estimated bit rotating hours = 53.0

         
                 

Fremantle

32.07°S

 

Transit 938 nmi from KIP-9B to Fremantle @ 10.5 kt

 

3.8

     
 

115.44°E

             
                 
Note 1: This leg has been scheduled for 60 days at sea.  

23.6

30.2

6.2

36.4

                 
       

TOTAL DAYS:

60.0

1
                 
DATE: 23 April 1998   FILE: I:\ DATA \ DSD_INFO \ LEG \183projB.xls BY: M. A. Storms      

To Table 2. Alternate Sites