SITE SUMMARY
Site: BON-8A
To 185 Site BON-8A Seismic Line
Priority:
1
Position: 31°18.5ŽN, 142°57.5ŽE
Water Depth: 6000 m
Sediment Thickness: 600 m
Target Drilling Depth: 900 mbsf
Approved Maximum Penetration: 900 mbsf
Seismic Coverage: Conrad 2005, Line 39, shotpoint #2936 at
1613Z on 10/13/76
Objectives: The objectives of BON-8A are the following
Drilling Program: APC, XCB, MDCB, RCB
Logging and Downhole Operations: Triple combo, GLT, FMS/Sonic, GHMT, ARI, Permeability
Nature of Rock Anticipated: Pelagic clay with volcanic arc ash (150 m); cherty porcellanites and chalks (450 m); basaltic pillows, flows, breccia, and possibly dikes (>300 m)