SITE SUMMARIES (continued)
Site: ENT-05A
Priority: 2
Position: 32°29.46'N, 134°46.48'E
Water Depth: 4125 m
Sediment Thickness: 3000 m
Target Drilling Depth: 800 mbsf
Approved Maximum Penetration: 800 mbsf
Seismic Coverage: 3-D seismic survey in 1999, Line 141-2D SP 642, crossing Line 842
Objectives: The objectives of Site ENT-05A are to
5. Determine the spatial distribution and temporal progression of the deformation
Logging and Downhole Tools: LWD, DVTP, and WSTP
Nature of Rock Anticipated: Interbedded hemipelagic mud/silty-sandy turbidites