SITE SUMMARIES
Site: 1040R-A
Objectives: The objectives of Site 1040R-A are to:
1. Install modified CORKs to monitor pressure and temperature and to sample fluids within the uppermost underthrust sediments.
2. Investigate the décollement.
3.Investigate fluid flow within the décollement and underthrust sediments.
Drilling Program: Install a modified CORK for monitoring fluid flow, pressure, and temperature
in the uppermost underthrust sediments (~400 mbsf). No coring planned; if time permits will core
320-410 mbsf.
Logging and Downhole: No downhole logging is planned at this site.
Nature of Rock Anticipated: Deformed claystones and hemipelagics